top of page

Churches

Essex Alliance Church

Williston Vermont

​​
Essex Alliance is a vibrant and growing ministry located near Burlington VT. This a new group of buildings for the church that is in the process of selling and re-locating from their existing facility. The project includes a worship Center to seat 1100 in phase one with an ultimate goal of 2000 seats. There is also a large youth area, and family life building for children's ministries. The master plan for the site includes six separate buildings. in addition to the phase one work there will be a large gymnasium, administraion building, wedding chapel, and separate youth annex. Completion of phase one is scheduled for the spring of 2015. 

GracePoint Gospel Fellowship

New City, New York

​​
Located near New York City, the work at Gracepoint included a large addition to an existing facility. The church needed a large multi-purpose room that could be used for both worship and as a gymnasium for the K-6 school that meets in its facility. The program also included a large fellowship lobby, new main entrance, and administrative offices for both the church and school. The multi-purpose building was pre-engineered to save on construction costs, and was married into a conventionally built addition that connected the new facility to the existing structure. The work was completed in 2009. 

West Park Church of Deliverance

Philadelphia PA

​​
Located on Chestnut Street in Philadelphia, West Park Church purchased what was originally Chestnut Street Baptist Church. This was a building that had been abandoned for many years and required a significant amount of historic restoration. Also included in this project were mechanical and electrical accomodations to modernize the existing facility, as well as a re-design of the stage area to facilitate West Park's style of worship. 

Fabre Street Pentecostal Church

Montreal, Quebec

​​
Located in the St Leonards portion of Montreal Fabre Street PC purchased a large manufacturing building that required renovation into a complete church and day care facility. A full feasibility study of each ministy in the church was done, and plans were developed for phasing the transition to the new facility. The day care, which was phase 1 was completed in the fall of 2012, and the church is continuing to makes the transition into the new facility. 

Walnut Hill Community Church

Bethel Connecticut

​​
The original facility at Walnut Hill was a pre-engineered multi-purpose building. Our work involved adding a large facility onto that original building dedicated to worship, nursery and youth ministries. A new main entrance, large fellowship lobby, nursery, worship center (seats 800), and youth worship space was included in this project that was completed in 2003. 

bottom of page